Delta MHPP

S U L A W E S I

Key Stat

Delta MHPP

The Delta river has a continuous flow or never dries up in the dry season and has a fairly extensive watershed with natural conditions that are still maintained. Based on observations in the field, it is known that this river has a steep slope

Capacity : 5,58 MW

Catchment area: 616 Km2

Annual rainfall: 2.016 mm

Head: 15,48 m

Design Flow: 44 m3/s

Estimated energy: 33,63 Gwh/yr

Location: Sulawesi

 

delta Hydropower plant Catchment Area .

Once in a lifetime

Hydropower Investment Opportunities

Do you want to start a great project with us ?

Developer Hydro energy Indonesia

River at the weir

Hydro power plant location

Location and slope of the penstock

Power house location plan

River at the power house

Condition of the road to the MHPP location

Access road to the MHPP location

Our Micro Hydropower Plant Projects